Output Analysis and Performance Measurement in short

A simulation run produces a lot of raw data. Output analysis turns that data into reliable measures, such as waiting time and utilization, and tells us how much to trust them.

Output Analysis and Performance Measurement: notes

Simulation run statistics

Simulation run statistics are the numbers collected during a run to describe how the system performed. They are the raw material of output analysis.

Two kinds of statistic are collected:

  • Observation based: a value for each entity, such as the waiting time of each customer. The result is a simple average over customers.
  • Time based: a value that lasts over time, such as the queue length. The result is an average weighted by time.

Common statistics are the mean, minimum, maximum, and standard deviation of waiting times, queue lengths, and server busy time.

Worked example. One server handles six customers. The table shows the run.

CustomerArrivesService timeService startsWaitsLeaves
102002
234307
3537210
411211013
512313116
616216018

From the table:

$$\begin{aligned} \text{Average wait} &= \frac{0+0+2+0+1+0}{6} = 0.5 \ \text{Average time in system} &= \frac{2+4+5+2+4+2}{6} = \frac{19}{6} = 3.17 \ \text{Average service time} &= \frac{16}{6} = 2.67 \end{aligned}$$

Only 2 of the 6 customers had to wait.

What this unit covers

  • Simulation run statistics
  • Output analysis techniques
  • Utilization measurement
  • Occupancy measurement
  • Performance metrics interpretation
  • Real-world problem analysis

Simulation run statistics

0 · 5 marks

How do you use simulation run statistics in the output analysis? Explain. [5]

Simulation run statistics are numerical measures collected during and after a simulation execution that quantify the performance of the system being modeled. In output analysis, these statistics serve as the primary data for evaluating whether the simulation model behaves as expected and for draw...

Open this answer on its own page →

Utilization measurement

0 · 5 marks

How to measure utilization and occupancy in simulation justify with any real-world problem. [5]

Show solved answer

Model Answer: Measuring Utilization and Occupancy in Simulation

Definition and Importance

Utilization measures the proportion of time a resource (server, machine, person) is actively in use during simulation.

Occupancy measures the number of entities present in a system or queue at any given time.

Both metrics are critical for evaluating system performance and efficiency.


Measurement Methods

1. Utilization Measurement

Utilization is calculated as:

$$\text{Utilization} = \frac{\text{Total time resource is busy}}{\text{Total simulation time}} \times 100%$$

Steps:

  • Track when each resource becomes busy and idle
  • Sum all busy periods for each resource
  • Divide by total simulation duration
  • Express as percentage

2. Occupancy Measurement

Occupancy is measured as:

$$\text{Average Occupancy} = \frac{\sum \text{(number of entities × time interval)}}{\text{Total simulation time}}$$

Steps:

  • Record entity count at each state change
  • Calculate time-weighted average
  • Track maximum and minimum occupancy

Real-World Problem: Hospital Emergency Department

Scenario

A hospital ED has 3 doctors and 5 treatment beds. We simulate patient arrivals and treatment times.

Measurements Applied

MetricMeasurementInterpretation
Doctor Utilization65%Doctors are busy 65% of time; 35% idle time suggests adequate capacity
Bed Occupancy3.2 beds (avg)On average, 3.2 of 5 beds occupied; indicates good resource balance
Queue Occupancy2.1 patients (avg)Average 2.1 patients waiting; identifies bottleneck

Decision Making

  • If utilization > 90%: Resource shortage; hire more doctors
  • If utilization < 40%: Over-staffing; reduce resources
  • If queue occupancy high: Increase beds or improve service speed

Justification

These metrics justify system improvements by providing quantitative evidence of:

  • Resource efficiency
  • Bottleneck identification
  • Cost-benefit analysis for capacity changes
  • Performance baseline for comparison