ECO155 ยท 2081 ยท 5 marks
Cost Analysis Question Consider the following cost schedule: | Output (Q) | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |---|---|---|---|---|---|---|---|---|---|---| | Total Cost (TC) | 200 | 250 | 254 | 265 | 270 | 300 | 350 | 380 | 400 | 420 | a. Compute TFC, AFC, AVC, AC and MC. b. Show the relations
Cost Analysis Question
Consider the following cost schedule:
| Output (Q) | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|---|---|---|---|---|---|---|---|---|---|---|
| Total Cost (TC) | 200 | 250 | 254 | 265 | 270 | 300 | 350 | 380 | 400 | 420 |
a. Compute TFC, AFC, AVC, AC and MC.
b. Show the relationship between AC and MC. [5+0]
Model Answer: Cost Schedule Analysis
Given Data
| Q | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
|---|---|---|---|---|---|---|---|---|---|---|
| TC | 200 | 250 | 254 | 265 | 270 | 300 | 350 | 380 | 400 | 420 |
Part (a): Computing TFC, AFC, AVC, AC, and MC
Step 1: Total Fixed Cost (TFC)
TFC = TC when Q = 0, since fixed cost does not vary with output.
$$TFC = 200 \text{ (constant at all output levels)}$$
Step 2: Total Variable Cost (TVC)
$$TVC = TC - TFC$$
| Q | TC | TVC |
|---|---|---|
| 0 | 200 | 0 |
| 1 | 250 | 50 |
| 2 | 254 | 54 |
| 3 | 265 | 65 |
| 4 | 270 | 70 |
| 5 | 300 | 100 |
| 6 | 350 | 150 |
| 7 | 380 | 180 |
| 8 | 400 | 200 |
| 9 | 420 | 220 |
Step 3: Average Fixed Cost (AFC = TFC/Q)
Step 4: Average Variable Cost (AVC = TVC/Q)
Step 5: Average Total Cost (AC = TC/Q)
Step 6: Marginal Cost (MC = ฮTC/ฮQ)
Combined table (values rounded to 2 decimals):
| Q | TC | TVC | AFC | AVC | AC | MC |
|---|---|---|---|---|---|---|
| 0 | 200 | 0 | - | - | - | - |
| 1 | 250 | 50 | 200 | 50 | 250 | 50 |
| 2 | 254 | 54 | 100 | 27 | 127 | 4 |
| 3 | 265 | 65 | 66.67 | 21.67 | 88.33 | 11 |
| 4 | 270 | 70 | 50 | 17.50 | 67.50 | 5 |
| 5 | 300 | 100 | 40 | 20 | 60 | 30 |
| 6 | 350 | 150 | 33.33 | 25 | 58.33 | 50 |
| 7 | 380 | 180 | 28.57 | 25.71 | 54.29 | 30 |
| 8 | 400 | 200 | 25 | 25 | 50 | 20 |
| 9 | 420 | 220 | 22.22 | 24.44 | 46.67 | 20 |
Sample calculations at Q = 5:
- $AFC = 200/5 = 40$
- $AVC = 100/5 = 20$
- $AC = 300/5 = 60$
- $MC = (300 - 270)/(5-4) = 30$
Part (b): Relationship between AC and MC
General Principle: The marginal cost curve cuts the average cost curve at the minimum point of AC.
-
When MC < AC: AC falls. Each extra unit costs less than the running average, dragging the average down.
-
When MC > AC: AC rises. Each extra unit costs more than the running average, pulling it up.
-
When MC = AC: AC is at its minimum (turning point).
Applying to this data:
Looking at the schedule, MC stays below AC throughout (MC ranges 4-50 while AC ranges 250 down to 46.67). Consequently, AC is continuously falling from 250 (Q=1) to 46.67 (Q=9). This is exactly consistent with the rule "MC < AC โ AC declining."
Note: In this dataset the AC minimum has not yet been reached within the given range (AC is still falling at Q = 9), so MC does not cross AC here. The theoretical crossing point (MC = AC at minimum AC) would occur beyond Q = 9 if the data continued.
Note on Part (b): AC does not reach its minimum at $Q = 8$. At $Q = 8$, AC = 50 while MC = 20, so MC is not equal to AC, and AC continues to fall to 46.67 at $Q = 9$. Throughout the given range MC < AC, so AC is monotonically declining and its minimum is not attained within the data.
Short on time? The 1, 5 and 10 mark versions of this answer, flashcards and practice sets come with a program pass.