CSC325 · 2078 · 5 marks
Explain the algorithm and its complexity for solving job sequencing with deadline problem using greedy strategy.
Explain the algorithm and its complexity for solving job sequencing with deadline problem using greedy strategy. [5]
Quick answer
Given n jobs, each with a deadline and a profit (earned only if the job is completed by its deadline), find a feasible sequence of jobs that maximizes total profit. Each job takes unit time to complete and only one machine (processor) is available.
Job Sequencing with Deadlines - Greedy Strategy
Problem Statement
Greedy Strategy
The greedy approach selects jobs in decreasing order of profit (most profitable job first) and schedules each job in the latest available time slot before its deadline.
Algorithm
JobSequencingWithDeadline(D, J, n, k)
1. Sort all jobs in decreasing order of profit P.
2. D(0) = J(0) = 0
3. k = 1
4. J(1) = 1 // Select the first (highest profit) job
5. for i = 2 to n do:
r = k
while D(J(r)) > D(i) and D(J(r)) ≠ r do:
r = r - 1
if D(J(r)) ≤ D(i) and D(i) > r then:
for l = k downto r+1 do:
J(l+1) = J(l)
J(r+1) = i
k = k + 1
6. Output J(1), J(2), ..., J(k) // Feasible job sequence with max profit
Step-by-Step Example
| Job | Deadline | Profit |
|---|---|---|
| J1 | 2 | 100 |
| J2 | 1 | 19 |
| J3 | 2 | 27 |
| J4 | 1 | 25 |
| J5 | 3 | 15 |
After sorting by profit (descending): J1(100), J3(27), J4(25), J2(19), J5(15)
- Select J1 → place at slot 2 → Schedule: [_, J1]
- Select J3 → deadline 2, slot 1 is free → Schedule: [J3, J1]
- Select J4 → deadline 1, slot 1 is taken → skip
- Select J2 → deadline 1, slot 1 is taken → skip
- Select J5 → deadline 3, slot 3 is free → Schedule: [J3, J1, J5]
Result: J3, J1, J5 with total profit = 27 + 100 + 15 = 142
Complexity Analysis
| Phase | Operation | Complexity |
|---|---|---|
| Sorting jobs by profit | Comparison sort | O(n log n) |
| Selecting and inserting each job | Inner while loop (at most k iterations per job) | O(n²) in worst case |
- The outer loop runs n times.
- The inner while loop and shifting loop together run at most O(n) per iteration.
- Therefore, the overall time complexity is:
$$T(n) = O(n^2)$$
The dominant term is the job insertion step, making the overall complexity O(n²).
Summary
| Aspect | Detail |
|---|---|
| Strategy | Greedy (highest profit first) |
| Key Idea | Schedule each job in latest available slot before deadline |
| Time Complexity | O(n²) |
| Optimality | Gives optimal (maximum profit) feasible schedule |