Systems Analysis and Design · Unit 2
Systems Development Life Cycle Phases
Exam-focused notes for Systems Development Life Cycle Phases (Systems Analysis and Design, BIT253): what the TU syllabus asks and how it has actually been tested, with 4 solved past questions from this unit.
Systems Development Life Cycle Phases in short
The SDLC divides a project into phases so that each stage has a clear purpose, a set of tasks, and a result. Knowing what happens in each phase is a core exam topic.
What this unit covers
- Planning phase activities
- Analysis phase activities
- Design phase activities
- Implementation phase purpose and activities
- Maintenance phase and system maintenance
- SDLC phases with suitable diagrams
- Types of maintenance
Planning phase activities
2082 · 10 marks
Describe the activities performed during planning, analysis, and design.List different participants involved in JAD.Explain how JAD session is carried out.[4+1+5]
Types of maintenance
Implementation phase purpose and activities
2081 · 10 marks
What is the purpose of implementation phase?Explain all six major activities of the implementation phase.[2+8]
Show solved answerHide answer
Implementation Phase: Purpose and Major Activities
Purpose of Implementation Phase [2 marks]
The implementation phase is the stage in the Software Development Life Cycle (SDLC) where the actual coding/programming of the software system takes place. The design documents produced in the design phase are translated into executable source code using a suitable programming language.
The main purposes are:
- To convert design specifications into working software
- To produce a fully functional, tested, and deployable software product
Six Major Activities of the Implementation Phase [8 marks]
1. Coding / Programming
This is the primary activity where developers write source code based on the design documents. Programmers follow coding standards and guidelines to ensure readability, maintainability, and consistency. Each module or component is coded separately and then integrated. The choice of programming language depends on the nature of the project (e.g., Java, Python, C++).
2. Code Review / Inspection
After coding, the written code is reviewed by peers or senior developers to identify errors, bugs, and deviations from coding standards. Code reviews help in:
- Detecting logical and syntactical errors early
- Ensuring adherence to design specifications
- Improving code quality before formal testing
This activity reduces the cost of fixing defects found later in the development cycle.
3. Unit Testing
Each individual module or unit of the software is tested independently to verify that it performs its intended function correctly. Unit testing is usually performed by the developer who wrote the code. It ensures that:
- Each function/method works as expected
- Boundary conditions and edge cases are handled
- Errors are caught at the module level before integration
4. Integration
Individual modules that have been coded and unit tested are combined (integrated) to form the complete system. Integration can be done using different strategies:
- Top-down integration: Higher-level modules are integrated first
- Bottom-up integration: Lower-level modules are integrated first
- Big Bang integration: All modules are integrated at once
The goal is to ensure that modules work together correctly as a unified system.
5. Integration Testing
After integration, the combined system is tested to verify that the modules interact correctly with each other. Integration testing checks:
- Data flow between modules
- Interface compatibility
- Combined functionality of integrated components
It detects interface defects and interaction errors that unit testing cannot reveal.
6. System Testing
The fully integrated software is tested as a whole against the original requirements and specifications. System testing includes:
- Functional testing: Verifying all features work as specified
- Performance testing: Checking speed, scalability, and reliability
- Security testing: Ensuring the system is protected from threats
- Usability testing: Evaluating the user interface and user experience
System testing is typically performed by a dedicated QA (Quality Assurance) team and is the final verification before the software is delivered to the client.
Summary Table
| Activity | Purpose |
|---|---|
| Coding | Translate design into source code |
| Code Review | Detect errors and ensure coding standards |
| Unit Testing | Test individual modules independently |
| Integration | Combine all modules into a complete system |
| Integration Testing | Test interactions between integrated modules |
| System Testing | Test the complete system against requirements |
Note: These activities collectively ensure that the software is correctly built, properly tested, and ready for deployment.
Maintenance phase and system maintenance
2079 · 5 marks
Define system maintenance. How do you conduct system maintenance? [5]
Make Unit 2 stick
Practice BIT253 with flashcards & quizzes