2080 2

CSC328 · 2080 · 10 marks

What is storage in GPSS? Describe the blocks associated to storage in GPSS. A machine tool in a manufacturing shop is turning out parts at the rate off one every 5 minutes. As they are finished the parts go on an inspector who takes 10±310 \pm 310±3 minutes to examine each one and rejects 1010%10 of

What is storage in GPSS? Describe the blocks associated to storage in GPSS. A machine tool in a manufacturing shop is turning out parts at the rate off one every 5 minutes. As they are finished the parts go on an inspector who takes 10±310 \pm 310±3 minutes to examine each one and rejects 1010%10 of the parts. Represent the system in GPSS using the concept of facility and run the simulation for 500 parts.[10]

Simulation and ModelingChapter 8: Simulation of Computer SystemsSimulation LanguagesNumerical: GPSS storage simulation

Storage in GPSS and Manufacturing Shop Simulation


Given

  • Part production rate: one part every $5$ minutes (deterministic inter-arrival time)
  • Inspection time: $10 \pm 3$ minutes (uniform distribution, range $7$ to $13$ minutes)
  • Rejection rate: $10%$ of parts rejected
  • Simulation length: $500$ parts
  • Modelling requirement: use the facility concept
  • Theory requirement: define storage and describe storage-related blocks

All data required is present and readable.


Solution

Part 1: Storage in GPSS

Definition

A storage in GPSS represents a resource that can be occupied by more than one transaction at the same time, up to a fixed capacity $N$. Whereas a facility is a single-server resource that only one transaction can hold at a time, a storage is a multi-server resource (a pool of $N$ identical servers). It is used to model things like a group of machines, a set of parking spaces, a bank of clerks, or a buffer of finite size.

Blocks Associated with Storage

BlockTypical formFunction
STORAGE (definition)name STORAGE NA statement that defines a storage entity and its capacity $N$
ENTERENTER name, kA transaction occupies $k$ units of the storage. If fewer than $k$ units are free, the transaction is held (queued) until they become available
LEAVELEAVE name, kA transaction releases $k$ units of the storage, freeing them for waiting transactions

If the amount k is omitted, it defaults to $1$.

Supporting blocks commonly used with storage

  • QUEUE / DEPART to gather waiting-line statistics before ENTER and after LEAVE
  • ADVANCE to represent the holding (service) time inside the storage

Facility vs Storage

FeatureFacilityStorage
Capacity$1$$N$ (multiple)
Occupy / free blocksSEIZE / RELEASEENTER / LEAVE
Typical useSingle inspector or single machinePool of machines, group of servers

Part 2: Manufacturing Shop Simulation (using a Facility)

System logic

Machine (1 part / 5 min) --> Queue --> Inspector (10±3 min) --> TRANSFER
                                                                    |
                                            90% ACCEPTED   <---+---> 10% REJECTED
                                            TERMINATE            TERMINATE

Since there is only one inspector, the inspector is modelled as a facility using SEIZE/RELEASE.

GPSS Program

*  ============================================
*  MANUFACTURING SHOP INSPECTION SIMULATION
*  Machine: 1 part every 5 minutes
*  Inspector: 10 +/- 3 minutes, rejects 10%
*  Run for 500 parts
*  ============================================

        SIMULATE

*  --- MACHINE GENERATES PARTS ---
        GENERATE    5,0         ; one part every 5 min (deterministic)

*  --- INSPECTOR (FACILITY) ---
        QUEUE       INSPQ       ; join inspection queue
        SEIZE       INSP        ; seize the single inspector
        DEPART      INSPQ       ; leave the queue
        ADVANCE     10,3        ; inspection time 10 +/- 3 (7..13)
        RELEASE     INSP        ; free the inspector

*  --- DECISION: 10% REJECTED, 90% ACCEPTED ---
        TRANSFER    .100,ACC,REJ  ; prob 0.100 -> REJ, else ACC

*  --- ACCEPTED PARTS ---
ACC     TERMINATE   1

*  --- REJECTED PARTS ---
REJ     TERMINATE   1

*  --- RUN CONTROL ---
        START       500
        END

Explanation of Each Block

BlockParametersPurpose
GENERATE 5,0Mean $=5$, spread $=0$Creates exactly one part every $5$ minutes (deterministic)
QUEUE INSPQQueue INSPQPart waits if inspector busy; records queue statistics
SEIZE INSPFacility INSPPart captures the single inspector
DEPART INSPQQueue INSPQPart leaves the queue after being served
ADVANCE 10,3Mean $=10$, spread $=3$Uniform inspection time in range $[7, 13]$ minutes
RELEASE INSPFacility INSPFrees inspector for the next part
TRANSFER .100,ACC,REJ$p = 0.100$With probability $0.10$ transaction goes to REJ; otherwise to ACC
TERMINATE 1 (ACC/REJ)Count $=1$Removes part and decrements termination counter
START 500$500$Runs until $500$ parts are terminated

Verification of numeric values

  • ADVANCE range: $10 - 3 = 7$ minimum, $10 + 3 = 13$ maximum. Correct uniform interval $[7,13]$.
  • TRANSFER probability operand .100 corresponds to $10%$ of parts routed to the reject branch, matching the stated $10%$ rejection.
  • Since each TERMINATE carries a count of $1$, the run stops after $500$ parts (accepted + rejected) have passed through, matching "run for 500 parts."

Expected proportions after 500 parts

  • Accepted $\approx 0.90 \times 500 = 450$ parts
  • Rejected $\approx 0.10 \times 500 = 50$ parts

These are the expected counts (subject to random variation of the RNG); the actual GPSS report gives the exact simulated figures.