STA169 · 2076 · 5 marks
A manufacturing company employs three analytical plans for the design and development of a particular product. For cost reasons, all three are used at varying times. In fact, plan 1, 2, and 3 are used for 30%, 20% and 50% of the products respectively. The defect rate in different procedures is as fo
A manufacturing company employs three analytical plans for the design and development of a particular product. For cost reasons, all three are used at varying times. In fact, plan 1, 2, and 3 are used for 30%, 20% and 50% of the products respectively. The defect rate in different procedures is as follows: $P(D/P_1) = 0.01$, $P(D/P_2) = 0.03$, $P(D/P_3) = 0.02$, where $P(D/P_j)$ is the probability of a defective product, given plan $j$. If a random product was observed and found to be defective, which plan was most likely used and thus responsible? [5]