3 Analysis

System Analysis and Design ยท Unit 3 ยท 13 hrs

Analysis

Exam-focused notes for Analysis (System Analysis and Design, CSC326): what the TU syllabus asks and how it has actually been tested, with 15 solved past questions from this unit.

Analysis in short

Analysis is the SDLC phase where a system's requirements are discovered in depth, split into requirements determination (collecting facts about the current system and desired changes) and requirements structuring (organising those facts into process, logic and data models).

Analysis: notes

Determining System Requirements

Collecting information accurately is the analyst's most important task: it lets the team deliver the right system within budget and time. A good analyst shows five habits: impertinence (question everything that exists or could exist), impartiality (seek the best solution, not a favoured one), relaxing constraints (assume anything is possible before ruling it out), attention to detail (every piece must fit for the system to work), and reframing (treat each system as needing a fresh approach). The deliverables are the raw material gathered: interview transcripts, observation notes, reports, job descriptions, analysed questionnaires, and completed forms.

Traditional Methods for Determining Requirements

  • Interviewing and listening: talking with users, individually or in a group, using a prepared outline; best for a small number of participants. Questions are open-ended (answers cannot be predicted) or closed-ended (a fixed set of answers, e.g. true/false or ranking).
  • Group interviewing: several key people interviewed together; uses time well and surfaces agreement/disagreement at once, but is harder to schedule.
  • Directly observing users: since people do not always recall or report their own work accurately, watching what they do supplements what they say.
  • Analysing procedures and documents: existing documentation reveals problems with the current system and why it was designed as it was, filling gaps interviews and observation leave.

Contemporary Methods for Determining System Requirements

Joint application design (JAD) brings key users, managers and analysts together in one intense, structured session to define requirements, revealing agreement and conflict directly rather than through separate interviews; it lowers cost, time and risk while improving software quality. Prototyping turns a basic requirement into a working partial system quickly, so users react to something concrete; it suits unclear requirements, since usability problems found early are far cheaper to fix than those found late.

Radical Methods for Determining System Requirements

Business process reengineering (BPR) replaces current methods with radically new ones: reorganising data flow, eliminating and combining steps, and becoming more responsive to change, aiming for breakthrough rather than incremental improvement. The first step is identifying the process to reengineer: understanding the organisation's key business processes (structured, measurable, customer-focused activity sets) and picking the specific activities that reengineering can most improve. Disruptive technologies break long-held business rules that had discouraged radical change; here the problem is identified first and the (disruptive) solution formulated after.

Structuring System Process Requirements and Process Modeling

Process modeling graphically represents the processes that capture, manipulate, store and distribute data between a system and its environment, and among its own components; its most common form is the data-flow diagram (DFD). Analysts use process and data models together to specify a system, and, with a CASE tool, these can even drive automatic generation of parts of it. The deliverables are a coherent set of DFDs: a context DFD, DFDs of the current physical system, DFDs of the new logical system, and a description of each component.

What this unit covers

  • Determining System Requirements: Introduction
  • Performing Requirements Determination
  • Traditional Methods for Determining Requirements
  • Contemporary Methods for Determining System Requirements
  • Radical Methods for Determining System Requirements
  • Structuring System Process Requirements: Introduction
  • Process Modeling
  • Data Flow Diagrams
  • Modeling Logic with Decision Tables, Decision Trees, and Pseudocodes
  • Structuring System Data Requirements: Introduction
  • Conceptual Data Modeling
  • Gathering Information for Conceptual Data Modeling
  • Introduction to E-R Modeling

Radical Methods for Determining System Requirements

2082 ยท 10 marks

Compare and contrast between observation and document analysis while requirement determination. Explain radical methods for determining the requirements.[10]

Show solved answer

Comparison of Observation vs. Document Analysis & Radical Methods for Requirements Determination


Part 1: Compare and Contrast - Observation and Document Analysis

Both observation and document analysis are methods used during requirements determination in the systems analysis phase. They supplement interviewing by providing additional insights into the current system.


Observation

  • The analyst physically watches how users perform their tasks and how the current system operates in real time.
  • Provides firsthand, direct evidence of actual workflows, bottlenecks, and informal procedures.
  • Useful for understanding undocumented practices that users may not mention in interviews.
  • Can reveal discrepancies between what users say they do and what they actually do.
  • Limitation: Users may change their behavior when they know they are being observed (Hawthorne effect). It is also time-consuming and may not capture rare events.

Document Analysis

  • The analyst examines existing documents, forms, reports, procedure manuals, and organizational records related to the current system.
  • As stated in the notes: "By examining existing system and organizational documentation, system analyst can find out details about current system and the organization."
  • Documents can reveal:
    • Problems with the existing system
    • Reasons why current systems were designed in a particular way
    • Data flows, inputs, and outputs already in use
  • Useful for understanding the formal, documented side of the organization.
  • Limitation: Documents may be outdated, incomplete, or may not reflect actual current practice.

Comparison Table

FeatureObservationDocument Analysis
NatureDirect, real-time watchingIndirect, reviewing existing records
SourcePeople and processes in actionForms, reports, manuals, files
CapturesInformal/actual practicesFormal/documented practices
TimelinessCurrent behaviorMay be outdated
EffortTime-consuming, requires presenceCan be done independently
LimitationObserver effect, rare events missedDocuments may be incomplete or obsolete
Best forUnderstanding actual workflowUnderstanding system history and design rationale

Key Contrast: Observation captures what actually happens, while document analysis captures what is formally recorded. Together, they provide a more complete picture than either method alone.


Part 2: Radical Methods for Determining Requirements

When traditional methods (interviews, observation, document analysis) are insufficient for achieving major improvements, radical methods are used. These methods aim to fundamentally rethink and redesign business processes rather than simply improving existing ones.


1. Business Process Reengineering (BPR)

Definition:

"The overall process by which current methods are replaced with radically new methods is referred to as Business Process Reengineering (BPR)."

BPR does not just improve the existing system -- it completely replaces old methods with new, more efficient ones.

Main Goals of BPR:

  • Reorganize the complete flow of data in major sections of the organization
  • Eliminate unnecessary steps in existing processes
  • Combine steps wherever possible to reduce redundancy
  • Become more responsive to future change

Core Idea:

BPR searches for the implementation of radical change in business processes to achieve breakthrough improvements in products and services. It is not about incremental improvement but about fundamental transformation.


2. Identification of Processes to Reengineer

Before reengineering can begin, the analyst must identify which processes need to change.

Steps:

  1. Understand key business processes:

    • "Key business processes are the structured set of measurable activities designed to produce a specific output for a particular customer or market."
    • These processes are customer-focused.
  2. Identify specific activities within those processes that can be radically improved through reengineering.


3. Disruptive Technologies

Definition:

"Technologies that enable breaking long-held business rules that discourage organizations from making radical business changes are called disruptive technologies."

Approach:

  • Problems are first identified, and then solutions are formulated using new technologies.
  • Disruptive technologies challenge existing assumptions and allow organizations to redesign processes in ways that were previously impossible.
  • Examples include the internet, mobile computing, cloud services, and AI -- technologies that fundamentally changed how businesses operate.

Summary Diagram

Radical Methods
      |
      |--- Business Process Reengineering (BPR)
      |         |--- Reorganize data flow
      |         |--- Eliminate/Combine steps
      |         |--- Improve responsiveness
      |
      |--- Identification of Key Processes
      |         |--- Customer-focused processes
      |         |--- Find activities to reengineer
      |
      |--- Disruptive Technologies
                |--- Break old business rules
                |--- Identify problems first, then solutions

Conclusion

Observation and document analysis are complementary traditional methods for requirements determination -- one capturing real behavior, the other capturing formal records. When these methods reveal that the existing system needs more than minor improvements, radical methods like BPR and disruptive technologies are applied to fundamentally redesign processes and achieve breakthrough results.

Open this answer on its own page โ†’

2081 ยท 5 marks

Explain how disruptive technologies can be used in determining requirement. [5]

Disruptive Technologies are technologies that enable breaking long-held business rules that discourage organizations from making radical business changes. They are used as part of Business Process Reengineering (BPR), which is a radical method for determining system requirements. --- The core app...

Open this answer on its own page โ†’

Data Flow Diagrams

2082 ยท 10 marks

Draw DFD for the following scenario: A patient after registration in the online pathology system will get login credentials. After the valid login the patient upon entering the details of test to be conducted will get the test date and time. The patient can also pay online. The patient can download the test report from the system after notification. The patient will also get schedule for doctor visit if required and in that case the report will also be emailed to the doctor.[10]

Show solved answer

DFD for Online Pathology System

Context Diagram (Level 0 DFD)

The Level 0 DFD shows the entire system as a single process with external entities and data flows.

                    Login Credentials
         +--------+<-------------------+
         |        |  Registration Data  |
         |Patient +-------------------->+
         |        |  Test Details       |              +--------+
         +---+----+-------------------->+              |        |
             |    |  Payment Info       | ONLINE       | Doctor |
             |    +-------------------->+ PATHOLOGY    |        |
             |    |  Test Date/Time     | SYSTEM       +---+----+
             |    |<--------------------+                  |
             |    |  Test Report        |                  |
             |    |<--------------------+                  |
             |    |  Doctor Schedule    |                  |
             |    |<--------------------+                  |
             +----+                     +------+-----------+
                                               |
                                        Report via Email

Level 1 DFD

The Level 1 DFD decomposes the system into major processes.

External Entities

  • Patient (E1)
  • Doctor (E2)

Processes

  • P1: Registration and Login
  • P2: Test Scheduling
  • P3: Online Payment
  • P4: Report Generation and Notification
  • P5: Doctor Visit Scheduling

Data Stores

  • D1: Patient Database
  • D2: Test Schedule Database
  • D3: Payment Database
  • D4: Report Database
  • D5: Doctor Database

Level 1 DFD Diagram

                Registration Data
E1 (Patient) -----------------------> [P1: Registration
                                            & Login]
                                            |
                Login Credentials           | Patient Record
             <-------------------------     v
                                        [D1: Patient DB]
                                            |
                Valid Login                 |
E1 (Patient) -----------------------> [P2: Test Scheduling]
                                            |
                Test Details               | Test Entry
             ----------------------->      v
                                        [D2: Test Schedule DB]
                                            |
                Test Date & Time            |
             <-------------------------     |
                                            |
                Payment Info               |
E1 (Patient) -----------------------> [P3: Online Payment]
                                            |
                Payment Confirmation        v
             <-------------------------  [D3: Payment DB]

                                       [P4: Report Generation
                                            & Notification]
                                            |
                                        [D4: Report DB]
                                            |
                Test Report                 |
E1 (Patient) <--------------------------    |
                                            |
                Doctor Visit Schedule       |
E1 (Patient) <------------------------ [P5: Doctor Visit
                                            Scheduling]
                                            |
                                        [D5: Doctor DB]
                                            |
                Report via Email            |
E2 (Doctor)  <------------------------------+

Detailed Level 1 DFD Description

ProcessInput Data FlowOutput Data FlowData Store Used
P1: Registration and LoginRegistration data from PatientLogin credentials to PatientD1: Patient DB
P2: Test SchedulingTest details from Patient (after valid login)Test date and time to PatientD2: Test Schedule DB
P3: Online PaymentPayment information from PatientPayment confirmation to PatientD3: Payment DB
P4: Report Generation and NotificationTest results from labNotification and report download to PatientD4: Report DB
P5: Doctor Visit SchedulingPatient report dataDoctor visit schedule to Patient; Report emailed to DoctorD5: Doctor DB

Summary of Data Flows

  1. Patient --> P1: Registration data
  2. P1 --> Patient: Login credentials
  3. Patient --> P2: Test details (after valid login)
  4. P2 --> Patient: Test date and time
  5. Patient --> P3: Payment information
  6. P3 --> Patient: Payment confirmation
  7. P4 --> Patient: Test report (after notification)
  8. P5 --> Patient: Doctor visit schedule
  9. P5 --> Doctor: Report via email

Note: The DFD follows standard Yourdon-DeMarco notation with rectangles for external entities, circles/rounded rectangles for processes, open rectangles for data stores, and arrows for data flows, which is the standard approach followed in system analysis and design curriculum.

Open this answer on its own page โ†’

2080 ยท 10 marks

What do you mean by balancing DFDs? Draw context diagram and data flow diagrams for online movie rental system that allows its users to watch movies online.[10]

Show solved answer

Balancing DFDs and DFDs for Online Movie Rental System


Part 1: Balancing DFDs

Balancing DFDs refers to the consistency that must be maintained between a parent DFD and its child DFD (exploded diagram) when decomposing a process into more detail.

Key Rules for Balancing:

  • Every data flow entering or leaving a process on a higher-level DFD must also appear on the corresponding lower-level (child) DFD for that process.
  • The inputs and outputs of a parent process must exactly match the inputs and outputs of the child diagram that decomposes it.
  • No new external entities should appear in a child DFD that were not present or implied in the parent.
  • Data stores that are used only within a child diagram (internal data stores) do not need to appear in the parent diagram, but any data store shared across processes must be consistent.

In short: what goes in and what comes out of a process must be the same at every level of decomposition.


Part 2: Context Diagram and DFDs for Online Movie Rental System

System Description

The Online Movie Rental System allows users to:

  • Register and log in
  • Browse and search movies
  • Rent/stream movies online
  • Make payments
  • Receive recommendations
  • Administrators manage movie catalog and generate reports

Level 0: Context Diagram

The context diagram shows the entire system as a single process with all external entities and major data flows.

                        Registration/Login Info
                   โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
                   โ”‚                                 โ–ผ
           โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”              โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
           โ”‚              โ”‚  Movie Search โ”‚                       โ”‚
           โ”‚    USER /    โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚                       โ”‚
           โ”‚   CUSTOMER   โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚   ONLINE MOVIE        โ”‚
           โ”‚              โ”‚  Movie Stream โ”‚   RENTAL SYSTEM       โ”‚
           โ”‚              โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚     (Process 0)       โ”‚
           โ”‚              โ”‚  Payment Info โ”‚                       โ”‚
           โ”‚              โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚                       โ”‚
           โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜              โ”‚                       โ”‚
                                         โ”‚                       โ”‚
           โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”              โ”‚                       โ”‚
           โ”‚              โ”‚ Movie Detailsโ”‚                       โ”‚
           โ”‚   ADMIN /    โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚                       โ”‚
           โ”‚  MANAGEMENT  โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                       โ”‚
           โ”‚              โ”‚  Reports     โ”‚                       โ”‚
           โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜              โ”‚                       โ”‚
                                         โ”‚                       โ”‚
           โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”              โ”‚                       โ”‚
           โ”‚   PAYMENT    โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                       โ”‚
           โ”‚   GATEWAY    โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚                       โ”‚
           โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜  Payment     โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
                             Confirmation

External Entities:

EntityRole
User/CustomerRegisters, searches, rents, and streams movies
Admin/ManagementManages catalog, views reports
Payment GatewayProcesses payment transactions

Level 1: DFD (Decomposition of Process 0)

This diagram breaks the main system into major sub-processes.

USER
 โ”‚
 โ”‚ Registration Info
 โ–ผ
โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”        โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  Process 1.0     โ”‚        โ”‚                 โ”‚
โ”‚  User            โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚  D1: USER DB    โ”‚
โ”‚  Registration    โ”‚        โ”‚                 โ”‚
โ”‚  & Login         โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                 โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜        โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
        โ”‚
        โ”‚ Verified User
        โ–ผ
โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”        โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  Process 2.0     โ”‚        โ”‚                 โ”‚
โ”‚  Browse &        โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚  D2: MOVIE DB   โ”‚
โ”‚  Search Movies   โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                 โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜        โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
        โ”‚
        โ”‚ Selected Movie
        โ–ผ
โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”        โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  Process 3.0     โ”‚        โ”‚                 โ”‚
โ”‚  Rental &        โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚  D3: RENTAL DB  โ”‚
โ”‚  Streaming       โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                 โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜        โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
        โ”‚
        โ”‚ Rental/Payment Request
        โ–ผ
โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”        โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  Process 4.0     โ”‚        โ”‚                 โ”‚
โ”‚  Payment         โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚ PAYMENT GATEWAY โ”‚
โ”‚  Processing      โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚                 โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜        โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
        โ”‚
        โ”‚ Payment Confirmation
        โ–ผ
โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”        โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  Process 5.0     โ”‚        โ”‚                 โ”‚
โ”‚  Report          โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บโ”‚  ADMIN /        โ”‚
โ”‚  Generation      โ”‚        โ”‚  MANAGEMENT     โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜        โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
        โ–ฒ
        โ”‚ Data from D1, D2, D3

Level 2: DFD for Process 3.0 - Rental and Streaming (Exploded)

This shows balancing: inputs/outputs of Process 3.0 match those in Level 1.

                    Selected Movie (from Process 2.0)
                              โ”‚
                              โ–ผ
                   โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
                   โ”‚  Process 3.1        โ”‚
                   โ”‚  Check Movie        โ”‚โ—„โ”€โ”€โ”€โ”€ D2: MOVIE DB
                   โ”‚  Availability       โ”‚
                   โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
                              โ”‚ Available Movie
                              โ–ผ
                   โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
                   โ”‚  Process 3.2        โ”‚
                   โ”‚  Create Rental      โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บ D3: RENTAL DB
                   โ”‚  Record             โ”‚โ—„โ”€โ”€โ”€โ”€โ”€โ”€โ”€ D3: RENTAL DB
                   โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
                              โ”‚ Rental Confirmed
                              โ–ผ
                   โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
                   โ”‚  Process 3.3        โ”‚
                   โ”‚  Stream Movie       โ”‚โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ–บ USER (Movie Stream)
                   โ”‚  to User            โ”‚
                   โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜
                              โ”‚ Rental/Payment Request
                              โ–ผ
                 (passed on to Process 4.0: Payment Processing)

Balancing Check

The Level 2 diagram takes exactly one input, Selected Movie from Process 2.0, and produces exactly one output, Rental/Payment Request to Process 4.0, which are the same input and output shown for Process 3.0 in the Level 1 diagram. The internal sub-processes (3.1, 3.2, 3.3) and the internal use of D3: RENTAL DB are visible only inside this exploded diagram, which is consistent with the balancing rule that a child DFD's external inputs and outputs must match its parent process exactly, while its internal detail need not appear at the parent level.

Open this answer on its own page โ†’

2079 ยท 10 marks

Why do we use DFD? Draw context diagram and data flow diagrams of a retail clothing store in a mall that sells different cloths to its customers.[10]

--- Process modeling involves graphically representing the processes that capture, manipulate, store, and distribute data between a system and its environment. A Data Flow Diagram (DFD) is the most common form of a process model. We use DFD for the following reasons: 1. Visual Representation: DFD...

Open this answer on its own page โ†’

2076 ยท 10 marks

Assuming a retail clothing store in a mall, draw a context diagram and a level-0 diagram that represent the selling system at the store.[10]

--- Process Modeling involves graphically representing the processes that capture, manipulate, store, and distribute data between a system and its environment. A Data Flow Diagram (DFD) is the common tool used. - Context Diagram (Level-0): Highest level DFD containing only one process representin...

Open this answer on its own page โ†’

Modeling Logic with Decision Tables, Decision Trees, and Pseudocodes

2081 ยท 10 marks

Draw a reduced decision table for the following scenario:An applicant has to fill up the form to participate in a music competition. The applicantโ€™s age should be greater than 18 years and nationality has to be Nepalese for being selected for the competition. The applicant will be provided a registration number after paying Rs. 5000 as an entry fee. The applicant has to play an instrument for three minutes else will be disqualified. The experts will provide points on the basis of some criteria. The applicant having the highest point will be declared winner and will get a cash prize of Rs. 1,00,000 and all the qualified applicants will get a gift hamper.[10]

Condition -------------- C1 Age 18 years C2 Nationality is Nepalese C3 Entry fee of Rs. 5000 paid C4 Plays instrument for 3 minutes C5 Has highest points among qualified applicants Action ----------- A1 Applicant is selected / eligible A2 Registration number provided A3 Applicant is disqualified ...

Open this answer on its own page โ†’

Process Modeling

2081 ยท 5 marks

Difference between process modeling and data modeling. How do you think data modeling play an important role? [5]

Process Modeling: Process modeling involves graphically representing the processes or actions that capture, manipulate, store, and distribute data between the system and its environment and among components within the system. A common form of a process model is a Data Flow Diagram (DFD). Data Mod...

Open this answer on its own page โ†’

Traditional Methods for Determining Requirements

2080 ยท 5 marks

List traditional methods for determining system requirements. Explain advantages and pitfalls of observing workers to determine system requirements. [5]

Show solved answer

Traditional Methods for Determining System Requirements & Observation Method

Traditional Methods for Determining System Requirements

The traditional methods used by system analysts to determine system requirements are:

  1. Interviewing - Conducting structured or unstructured interviews with users, managers, and stakeholders to gather information about the current system and requirements.

  2. Observing Workers - Directly watching employees perform their day-to-day tasks to understand how the current system is actually used in practice.

  3. Analyzing Procedures and Documents - Examining existing organizational documents, manuals, reports, forms, and records to find details about the current system, its problems, and the reasons why current systems are designed the way they are.

  4. Questionnaires/Surveys - Distributing written sets of questions to a large number of users to collect information efficiently.

  5. Joint Application Development (JAD) - Bringing together users, managers, and analysts in structured group sessions to define system requirements collectively.


Observing Workers to Determine System Requirements

Observation involves the system analyst directly watching workers perform their tasks in their actual work environment to understand how the current system operates.


Advantages of Observing Workers

  1. First-hand, Accurate Information

    • The analyst sees exactly how tasks are performed in reality, not just how users think or say they perform them. This reduces misunderstandings and inaccuracies.
  2. Reveals Undocumented Processes

    • Workers often follow informal procedures or shortcuts that are never written down. Observation uncovers these hidden steps that interviews or documents might miss.
  3. Validates Other Information

    • Observation can confirm or contradict information gathered through interviews and questionnaires, helping the analyst cross-check data.
  4. Understanding the Work Environment

    • The analyst gains insight into the physical and organizational context, such as workload, interruptions, and communication patterns, which helps in designing a more practical system.
  5. No Reliance on Memory

    • Unlike interviews where users must recall how they work, observation captures real-time behavior, making the data more reliable.

Pitfalls of Observing Workers

  1. Hawthorne Effect (Change in Behavior)

    • Workers may change or improve their behavior when they know they are being watched. This means the analyst may not see the true, everyday way tasks are performed, leading to inaccurate requirements.
  2. Time Consuming

    • Observation requires the analyst to spend significant time at the workplace, making it an expensive and slow method, especially for complex or lengthy processes.
  3. Incomplete Picture

    • Not all tasks occur frequently or during the observation period. Rare but important processes may be missed entirely.
  4. Disruption to Work

    • The presence of an observer can distract workers and slow down normal operations, causing inconvenience to the organization.
  5. Analyst Bias

    • The analyst may misinterpret what they observe or focus on certain activities while overlooking others, leading to a biased understanding of requirements.
  6. Limited to Observable Tasks

    • Mental or decision-making processes that workers perform internally (such as judgment calls or reasoning) cannot be captured through observation alone.

Conclusion

, "both interviewing and observing have some sort of limitations", which is why observation is best used in combination with other methods such as document analysis and interviewing to get a complete and accurate picture of system requirements.

Open this answer on its own page โ†’

2076 ยท 5 marks

What is a group interview? What are the benefits and drawbacks of group interviews? [5]

A group interview is a requirements gathering technique in which several key people (stakeholders, users, or subject matter experts) are interviewed together at the same time, rather than individually. It is used to discover views about the current system and the target system from multiple parti...

Open this answer on its own page โ†’

Introduction to E-R Modeling

2080 ยท 5 marks

Draw ER diagram to store data about students, programs, and courses at your college. [5]

Based on conceptual data modeling principles (the primary deliverable of which is the Entity-Relationship diagram), the following entities, attributes, and relationships are identified. --- Entity Attributes ------ STUDENT StudentID (PK), StudentName, Address, Email, DateOfBirth PROGRAM ProgramID...

Open this answer on its own page โ†’

Contemporary Methods for Determining System Requirements

2079 ยท 5 marks

Explain Joint Application Design in brief. How is it better than traditional information gathering techniques? [5]

Joint Application Design (JAD) is a team-based approach for defining the requirements for new or modified systems. The main idea behind JAD is to bring together the key users, managers, and system analysts involved in the analysis of a current system in one structured session to collect system re...

Open this answer on its own page โ†’

2078 ยท 5 marks

How can you use prototyping for determining system prototyping requirements? Compare throwaway with evolutionary prototyping. [5]

Prototyping is a form of Rapid Application Development (RAD) in which, instead of spending a lot of time producing very detailed specifications, developers find out only generally what the users want. Rather than developing the complete system all at once, developers quickly create a prototype --...

Open this answer on its own page โ†’

Conceptual Data Modeling

2079 ยท 5 marks

What is conceptual data modeling? Explain conceptual data modeling process. [5]

Conceptual Data Modeling is the process of creating a conceptual representation of data objects, the associations between different data objects, and the rules governing those associations, without concern for how the data will be physically stored. It focuses on identifying and defining the key ...

Open this answer on its own page โ†’

2078 ยท 10 marks

What is conceptual data model? How do you gather information for conceptual data modelling? Draw an ER diagram for a retail store in a mall which sells different items to its customers.[10]

--- A conceptual data model is a high-level, abstract representation of the data requirements of an organization or system. It identifies the key entities, their attributes, and the relationships among them, without concern for how the data will be physically stored in a database. Key characteris...

Open this answer on its own page โ†’