System Analysis and Design ยท Unit 1 ยท 10 hrs
Foundations for Systems Development
Exam-focused notes for Foundations for Systems Development (System Analysis and Design, CSC326): what the TU syllabus asks and how it has actually been tested, with 20 solved past questions from this unit.
Foundations for Systems Development in short
This chapter lays the conceptual foundation for systems analysis and design: what an information system is, the life cycle used to build one, the alternative methodologies and tools available, and how the project of building it is itself managed and scheduled.
What this unit covers
- Introduction
- A Modern Approach to Systems Analysis and Design
- Developing Information Systems and the Systems Development Life Cycle
- The Heart of the Systems Development Process and Traditional Waterfall SDLC
- CASE Tools
- Other Approaches: Prototyping; Spiral; Rapid Application Development; Introduction to Agile Development
- Managing the Information Systems Project: Introduction
- Managing the Information Systems Project
- Representing and Scheduling Project Plans
- Using Project Management Software
Managing the Information Systems Project
2082 ยท 10 marks
List different phases of project management. Explain the different steps involved in the first phase of project management.[10]
Show solved answerHide answer
Phases of Project Management and Steps in the First Phase
Definition
Project Management is the process of planning, organizing, directing, and controlling resources (people, equipment, and materials) to meet the technical, cost, and time constraints of a project.
Different Phases of Project Management
The project management process consists of the following phases:
| Phase | Name |
|---|---|
| Phase 1 | Initiating (Project Conceptualization and Planning) |
| Phase 2 | Planning (Blueprint and Schedule Development) |
| Phase 3 | Executing (Implementation) |
| Phase 4 | Monitoring and Control (Tracking Progress) |
| Phase 5 | Closure/Termination (Delivery and Review) |
Steps Involved in the First Phase: Initiating / Project Planning
The first phase is the most critical phase where the foundation of the entire project is laid. During this phase, the project is conceptualized and feasibility is determined. The following steps are involved:
Step 1: Defining the Project Goal and Scope
- Clearly identify what the project will deliver
- Define the boundaries of the project (what is included and what is not)
- A scope statement is prepared which is a list of project objectives and deliverables
- Set measurable goals and success criteria
- This step answers the question: "What are we building and why?"
Step 2: Identifying the Project Manager and Team
- A suitable project manager is identified who will be responsible for the entire project
- Key stakeholders and team members are identified
- Roles and responsibilities are assigned to team members
- The right personnel with required skills are selected
Step 3: Feasibility Analysis
Feasibility analysis determines whether the project is worth pursuing. It reduces the number of business options. The three main types are:
a) Economic Feasibility (Cost-Benefit Analysis)
- Analyzes whether the expected benefits equal or exceed the expected costs
- Identifies financial benefits and costs associated with the development project
- Review worksheets are used to record costs and benefits
- These worksheets are used after each phase to decide whether to continue, redirect, or kill the project
b) Technical Feasibility
- Evaluates whether the new system will perform adequately
- Assesses whether the organization has the ability to construct the proposed system
- The amount of technical risk depends on four primary factors:
- Project size
- Project structure
- Development group's experience with the application and technology area
- User group's experience with systems development
c) Operational Feasibility
- Assesses whether the proposed system will likely solve the business problems or take advantage of opportunities
- Evaluates how the new system will fit into the existing organizational environment
Step 4: Identifying Potential Risks
- Identify potential risks that may affect the project as early as possible
- Assess their probability and impact
- Organizations typically expect a greater return on investment for riskier projects
- Develop mitigation and contingency plans to handle identified risks
Step 5: Project Identification and Selection
- Classifying and ranking projects can be performed by top managers, a steering committee, business units, or the IS development group
- Criteria used to assign merit to a project include: cost, duration, complexity, system size, and focus
- An important evaluation method is Value Chain Analysis
- Factors considered during selection include:
- Existing systems and ongoing projects
- Resource availability
- Evaluation criteria
- Current business conditions
- Perspectives of decision makers
Step 6: Setting the Project Baseline
- Determine the scope of the project using a scope statement
- Break down all work required into individual tasks and subtasks with detailed descriptions
- Map out the project schedule with clearly defined due dates and a final deadline
- A Gantt chart is a good tool for this purpose
- Plan the total cost of the project including hourly rates, available resources, etc.
- The project baseline must be clearly outlined before moving to the next stage
Step 7: Creating the Project Plan Document
- Document all the above information into a formal Software Project Plan (SPP)
- The primary deliverable from this phase is a schedule of specific IS development projects
- Acts as a reference guide throughout the project lifecycle
- Provides assurance that people gave careful consideration to project selection
Incremental Commitment
An important concept in the first phase is incremental commitment, which is a strategy in which the project is reviewed in system analysis and design, and the project is rejustified in each of these reviews. This ensures that only viable projects continue forward.
Conclusion
The first phase (Initiating/Planning) is the most important phase as all other phases depend on it. A well-planned project has higher chances of being delivered on time, within budget, and with expected quality. Poor planning leads to project failure, cost overruns, and missed deadlines. The feasibility analysis conducted during this phase ensures that only projects with genuine business value and technical viability are pursued.
2081 ยท 5 marks
Briefly explain different phases of project management. [5]
2079 ยท 5 marks
Explain common skills of a project manager. Which skill do you think is most important? [5]
2078 ยท 5 marks
What is project management? Explain some activities and skills of a project manager. [5]
Other Approaches
2082 ยท 5 marks
Highlight the critical factors that distinguish agile methods from traditional methods. [5]
Show solved answerHide answer
Critical Factors Distinguishing Agile Methods from Traditional Methods
Introduction
Agile development was primarily intended to help developers build projects that can adapt to changing requirements quickly, enabling easy and rapid project achievement. Traditional methods (such as Waterfall, SDLC) follow a rigid, sequential approach. The following factors highlight the key distinctions between the two.
Critical Distinguishing Factors
1. Flexibility vs. Rigidity
- Agile: Designed to accommodate transforming/changing requests at any stage of development. Requirements can evolve throughout the project lifecycle.
- Traditional: Requirements are fixed at the beginning. Changes are difficult and costly to incorporate once a phase is completed.
2. Iterative Development vs. Sequential Phases
- Agile: Development proceeds through iterations (short cycles). Even in early phases, a skeletal/outline architecture is built and refined progressively through iterations to the first release.
- Traditional: Follows a strict sequence of phases (requirements โ design โ implementation โ testing โ maintenance) where each phase must be completed before the next begins.
3. Customer Involvement
- Agile: Customers are actively involved throughout the project. In the planning phase, developers and customers together agree on delivery dates and solutions to business problems.
- Traditional: Customer involvement is primarily at the beginning (requirements gathering) and at the end (acceptance testing), with minimal interaction in between.
4. Delivery Approach
- Agile: Focuses on early and continuous delivery. The productionizing phase releases the product and improves it by adding features incrementally over time.
- Traditional: The complete product is delivered only at the end of the full development cycle, meaning the customer waits longer to see a working system.
5. Team Skills and Collaboration
- Agile: Requires a highly collaborative, technically strong team with a curious attitude toward the work environment, its problems, technologies, and people (Exploration phase). Team members must be skilled in estimation and adaptive thinking.
- Traditional: Roles are more formally defined and separated. Team members work within their designated phase with less cross-functional collaboration.
6. Project Size and Cost Suitability
- Agile: Best suited for dynamic, medium-to-large projects where requirements are likely to change. Less suitable for cheaper or smaller projects.
- Traditional: More suitable for well-defined, stable projects where requirements are clearly understood from the start, including smaller and cheaper projects.
7. Documentation
- Agile: Emphasizes working software over comprehensive documentation. Less formal documentation is maintained.
- Traditional: Relies heavily on detailed documentation at every phase as a primary deliverable before moving forward.
Summary Table
| Factor | Agile Method | Traditional Method |
|---|---|---|
| Requirements | Flexible, evolving | Fixed upfront |
| Development Style | Iterative | Sequential |
| Customer Role | Continuous involvement | Limited involvement |
| Delivery | Incremental releases | Single final delivery |
| Documentation | Minimal | Extensive |
| Change Handling | Welcomes change | Resists change |
| Team Nature | Highly collaborative | Role-separated |
Conclusion
Agile methods are fundamentally distinguished from traditional methods by their adaptability, iterative nature, and continuous customer collaboration, making them ideal for projects in dynamic environments where requirements are subject to frequent change.
2081 ยท 10 marks
Explain prototyping model with a neat diagram. List out its advantages and disadvantages.[10]
Show solved answerHide answer
Prototyping Model
Definition
The Prototyping Model is a software development approach in which a working prototype (an early, incomplete version of the system) is built, evaluated by the user, and iteratively refined based on feedback until the final system is developed.
: "Instead of spending a lot of time producing very detailed specifications, the developers find out only generally what the users want... they quickly create a prototype, which either contains portions of the system or is a small-scale working model of the entire system."
Concept
Rather than freezing all requirements before design or coding begins, a prototype is created to help users visualize and validate the system. The prototype is refined repeatedly until the customer is satisfied, after which the final engineered product is delivered.
Phases of the Prototyping Model
a) Requirement Gathering
Basic and general requirements are collected from the customer. Complete details are not required at this stage.
b) Quick Design
A simple, quick design is prepared focusing on important aspects such as user interface and input/output formats. It is not a detailed design.
c) Build Prototype
Information gathered from the quick design is used to construct the first working prototype, which represents a working model of the required system.
d) User Evaluation
The prototype is presented to the user, who evaluates it and identifies its strengths and weaknesses, such as what needs to be added or removed.
e) Refine Prototype
If the user is not satisfied, the prototype is refined using the additional information provided by the user. Steps (b) through (e) are repeated iteratively.
f) Engineer Product
Once requirements are completely met and the user accepts the final prototype, the complete final system is engineered with proper coding, testing, and documentation. Routine maintenance follows to prevent large-scale failures and minimize downtime.
Neat Diagram
+-------------------------+
| Requirement Gathering |
+-------------------------+
|
v
+-------------------------+
| Quick Design |
+-------------------------+
|
v
+-------------------------+
| Build Prototype |
+-------------------------+
|
v
+-------------------------+
| User Evaluation |
+-------------------------+
|
+---------+---------+
| |
Not Satisfied Satisfied
| |
v v
+----------------+ +------------------+
| Refine | | Engineer Final |
| Prototype | | Product |
+----------------+ +------------------+
| |
| v
+----------> +------------+
| Maintain |
| System |
+------------+
The loop between Quick Design, Build Prototype, User Evaluation, and Refine Prototype continues until the user is satisfied.
Advantages of the Prototyping Model
| # | Advantage |
|---|---|
| 1 | Reduces risk of building the wrong system since user feedback is incorporated early and continuously. |
| 2 | Better understanding of requirements as users can see and interact with a working model rather than reading abstract specifications. |
| 3 | Improved user involvement as the customer actively participates throughout the development process. |
| 4 | Early error detection as misunderstandings and missing features are identified and corrected in early stages. |
| 5 | Useful when requirements are unclear and not well-defined initially, making it ideal for complex or novel projects. |
| 6 | Reduces development time for the final product since major issues are resolved during the prototyping phase. |
| 7 | Higher user satisfaction because the final product closely matches user expectations. |
Disadvantages of the Prototyping Model
| # | Disadvantage |
|---|---|
| 1 | Increased cost as building and refining multiple prototypes requires additional time and resources. |
| 2 | Poor documentation as the focus on rapid prototype development may lead to inadequate or incomplete documentation. |
| 3 | Customer confusion as the customer may mistake the prototype for the final product and expect immediate delivery. |
| 4 | Scope creep as continuous user feedback and changes may lead to ever-expanding and uncontrolled requirements. |
| 5 | Poorly structured system as too many refinements without proper planning may result in poor overall system architecture. |
| 6 | Developer attachment as developers may attempt to reuse prototype code in the final product, leading to suboptimal quality and maintainability. |
Conclusion
The Prototyping Model is best suited for projects where requirements are unclear or frequently changing. It ensures higher user satisfaction through early visualization and active involvement. However, it must be carefully managed to avoid scope creep, poor documentation, and degraded system architecture.
2078 ยท 5 marks
Write short notes on: a. Agile development b. Decision tree [5]
Show solved answerHide answer
Short Notes
a. Agile Development (2.5 marks)
Agile Development is a software development approach mainly intended to help developers build a project that can adapt to transforming (changing) requirements quickly. It was developed to make project achievement easy and rapid.
Key Characteristics:
- Changing requirements can be accommodated at any stage
- Progress can be measured throughout development
- Reduces development time
- Increases reusability of components
- Improves productivity with fewer people in a short time
Phases of Agile Development:
| Phase | Description |
|---|---|
| Exploration | Team practices estimating time needed for various tasks; curious attitude toward work environment, problems, and technologies |
| Planning | Developers and customers agree on a delivery date (typically 2 months to 6 months) for business solutions |
| Iterations to First Release | The entire architecture of the system is sketched out, even in skeletal/outline form |
| Productionizing | The product is released and may be improved by adding further features |
| Maintenance | Once released, the system is kept running smoothly |
b. Decision Tree (2.5 marks)
A Decision Tree is a flowchart-like tree structure used for classification and decision-making, where:
- Each internal node denotes a test on an attribute
- Each branch represents an outcome of that test
- Each terminal (leaf) node holds a class label (final decision/result)
Diagram:
[Attribute Test]
/ \
Yes/ \No
/ \
[Sub-test] [Class Label]
/ \
[Label] [Label]
Key Points:
- It is widely used in decision support systems and information systems development for project evaluation
- It provides a visual and logical representation of decisions and their possible consequences
- It is easy to understand and interpret
- Used in classification problems in machine learning and management decision-making
Example: A decision tree can be used to classify whether a project should be selected based on attributes like cost, duration, and complexity.
2076 ยท 10 marks
What is the waterfall model? Explain the prototyping model for developing information systems along with merits and demerits.[10]
Show solved answerHide answer
Waterfall Model and Prototyping Model
Waterfall Model
The Waterfall Model is a linear, sequential approach to software/information system development where each phase must be completed before the next phase begins. It follows a strict top-down approach, resembling a waterfall flowing downward. It was one of the earliest SDLC models, proposed by Winston W. Royce in 1970.
Phases of the Waterfall Model:
| Phase | Description |
|---|---|
| 1. Requirements Gathering | All system requirements are collected and documented |
| 2. System Analysis | Requirements are analyzed for feasibility and clarity |
| 3. System Design | Architecture and system specifications are designed |
| 4. Implementation (Coding) | The actual system is developed/coded |
| 5. Testing | The system is verified and validated |
| 6. Deployment and Maintenance | The system is delivered and maintained |
Each phase acts as an input to the next phase, and once a phase is completed, it is assumed to be final. There is no going back to a previous phase.
Prototyping Model
Prototyping is a form of Rapid Application Development (RAD). Instead of spending a lot of time producing very detailed specifications, the developers find out only generally what the users want. The developers do not develop the complete system all at once. Instead, they quickly create a prototype, which either contains portions of the system or is a small-scale working model of the entire system. After reviewing the prototype with the users, the developers refine and extend it. This process is continued until the final specifications are met.
A prototype is a preliminary working model of the system that demonstrates the functionality but may not contain exact logic or complete features.
Steps in the Prototyping Model:
Step 1: Requirement Gathering
- Basic and initial requirements are identified from the user.
- Developers find out generally what the users want without going into full detail.
Step 2: Quick Design
- When requirements are known, a quick design for the system is created.
- It is not a detailed design and includes only the important aspects of the system.
Step 3: Build Prototype
- Information gathered from the quick design is used to form the first prototype.
- This prototype represents the working model of the required system.
Step 4: User Evaluation
- The proposed prototype is presented to the user.
- The user recognizes its strengths and weaknesses, such as what is to be added or removed.
Step 5: Refine Prototype
- If the user is not satisfied with the prototype, the current prototype is refined with the additional information provided by the user.
- The cycle of build โ evaluate โ refine continues iteratively.
Step 6: Engineer Final Product
- Once the requirements are completely met, the user accepts the final prototype.
- The final system is then followed by routine maintenance on a regular basis to prevent large-scale failures and minimize downtime.
Diagram of Prototyping Model:
Requirement Gathering
โ
Quick Design
โ
Build Prototype
โ
User Evaluation โโโโโโโโโโโโโโโ
โ โ
Satisfied? โโโโ No โโโ Refine Prototype
โ
Yes
โ
Engineer Final Product
โ
Maintenance
Merits of the Prototyping Model
- Active User Involvement -- Users participate throughout the development process, leading to better understanding of requirements.
- Reduced Risk of Failure -- Errors and misunderstandings are detected early through continuous user feedback.
- Better Requirement Clarity -- Helps identify missing or unclear requirements at an early stage.
- Improved Communication -- The prototype serves as a visual and working tool for discussion between users and developers.
- Faster Initial Delivery -- Users can see a working model quickly, which increases confidence and satisfaction.
- Flexibility -- Changes can be easily incorporated at early stages before full development begins.
Demerits of the Prototyping Model
- Increased Cost -- Multiple iterations of building and refining prototypes can be expensive and resource-intensive.
- Time-Consuming -- Continuous user feedback and revisions may delay the overall project completion.
- Scope Creep -- Users may keep requesting changes endlessly, expanding the project scope beyond original plans.
- Poor Documentation -- Focus on rapid prototyping may lead to inadequate or incomplete documentation.
- User Confusion -- Users may mistake the prototype for the final system, leading to unrealistic expectations.
- Quality Compromise -- Developers may use shortcuts in the prototype that inadvertently carry over to the final system.
Conclusion
The Waterfall Model is best suited for projects with well-defined and stable requirements, where each phase can be completed sequentially without revisiting. The Prototyping Model, on the other hand, is ideal when requirements are unclear or likely to change, as it allows iterative refinement through active user participation and rapid model building. Both models are important SDLC approaches used in information systems development depending on the nature and complexity of the project.
2076 ยท 5 marks
What is rapid application development? Explain. [5]
2076 ยท 5 marks
Write short notes on: a. Spiral model b. Decision table [5]
The Heart of the Systems Development Process and Traditional Waterfall SDLC
2082 ยท 5 marks
Illustrate the heart of the software development process. [5]
2080 ยท 10 marks
What activities are at the heart of systems development process? List and explain some of the problems with the traditional waterfall SDLC. Explain Agile development in brief.[10]
CASE Tools
2081 ยท 5 marks
How can CASE tool help in developing product? Explain with respect to different phases of SDLC. [5]
2079 ยท 5 marks
Write short notes on: a. CASE tools b. Baseline project plan [5]
2078 ยท 5 marks
Why do we need CASE tool during system development? What are different components of CASE tool? [5]
Representing and Scheduling Project Plans
2081 ยท 5 marks
Write short notes on: a. PERT b. Deliverables [5]
2080 ยท 5 marks
Write short notes on: a. Network Diagram b. Structural and Behavioral Diagrams [5]
Developing Information Systems and the Systems Development Life Cycle
2078 ยท 10 marks
What is system development life cycle (SDLC)? Explain each phase of SDLC in detail.[10]
Introduction
2078 ยท 5 marks
What is system analysis and design? Why is it important for developing information systems? [5]
A Modern Approach to Systems Analysis and Design
2076 ยท 5 marks
Explain the modern approach to system analysis and design. [5]